|  | 
| They installed some windows today. | 
|  | 
| Framing for the roof ready for install....hopefully tomorrow! | 
|  | 
| More roof framing. This has some sort of light weight insulation already on it. I hope they put wood on it once it's installed. | 
|  | 
| The view from my front door. The lot just to the right has been sold! It will be nice to have something to look at. | 
|  | 
| The back of the house with windows and sliding door wrapped and installed! | 
|  | 
| I was wondering about this....and I'm glad for it. The window box that comes with Elevation L has drainage holes. Yippy Skippy! | 
|  | 
| And here is the window box nestled next to Kaylee's tub. | 
 
I love the window boxes!
ReplyDelete